Why summer is the right time to plan a Sydney renovation - Landart

Why summer is the right time to plan a Sydney renovation

Home Renovation

Why summer is the right time to plan a Sydney renovation

3 November 2026 9 min read

A few weeks at home over the holidays will tell you more about what your house needs than any amount of browsing. Used well, that time gets design, approvals and a builder lined up, so work can start when the weather cools rather than a year later.

Key takeaways

  • The months before anyone arrives on site are the ones people underestimate. Design, documentation and approval usually take longer than expected, so planning has to start well ahead of the start date you have in mind.
  • The summer break is the best time to settle the brief, because you are living with the problems you want fixed.
  • Whether your project goes through a complying development certificate (CDC) or a development application (DA) shapes the timeline more than any other single factor.
  • Designing the garden alongside the house avoids paying twice for access, excavation and drainage.
  • Indicative timeframes are in the FAQ at the foot of this page.

Summer has a way of exposing a house. Family stay for a week and the kitchen runs out of bench space by lunchtime. The living room that felt generous in winter cooks by four in the afternoon. The garden, which should be the best room in the house in December, sits behind a single sliding door that nobody opens because it leads to a strip of paving and nowhere else.

Most people make a mental note and move on. The homeowners who end up with a finished renovation the following summer tend to do something different: they use the break to write that list down, and by February they are talking to someone about it.

Why does a renovation take so long to start?

A major renovation moves through a set of stages, and each one depends on the last. There is the brief and a feasibility look at the site. Then concept design, then detailed documentation, which brings in a surveyor, a structural engineer, a BASIX certificate and often a geotechnical or arborist report. Then approval. Then pricing and contract. Only then does anyone start on site.

On a major renovation we typically allow three to four months for design and documentation before anything is lodged for approval. Add the approval itself, and the gap between a first meeting and a crew on site is longer than most people expect.

There is also the calendar. Most of the building industry closes from just before Christmas until early or mid January, and suppliers and consultants follow the same rhythm. Councils largely shut down through December and January too. A project that is still at concept stage in December rarely starts building before winter. A project that has its concept and approval path settled in January has a realistic chance of starting in autumn.

Summer is for the brief, autumn is for the build.

Do I need a CDC or a DA?

This is the question that decides your timeline. A complying development certificate is a fast-track approval for work that meets set standards under the state’s codes and legislation. It usually goes through a private certifier, and when a project fits, it takes about six to eight weeks to document and approve.

A development application goes to council. It is notified to neighbours, assessed against the local plan and can attract requests for more information along the way. For a major renovation in the Eastern Suburbs or on the Northern Beaches, a DA commonly runs to several months.

Plenty of projects simply cannot use the CDC route. Heritage items are excluded, and heritage conservation areas, which cover large parts of Woollahra, Paddington, Waverley and the North Shore, can be excluded or heavily restricted too. On the Northern Beaches, bushfire-prone, flood-prone and coastal hazard land brings extra reports and can rule a CDC out on some sites. Knowing which path you are on early lets the design work with it rather than against it. In our experience most avoidable DA delays come from information missing at lodgement, so we put the time into a complete package before it goes in.

“Plan early. We find people get frustrated with the process because their ideal timeline is not achievable because it is unrealistic and the real project planning timeline has been underestimated. Leave yourself plenty of time to plan and make decisions without unnecessary time pressure. If you want to start building in a year, then start designing and planning now.”

Matt Leacy, Landart founder and Creative Director

What should I do over the break?

The brief first. Write down how the house lets you down this summer, room by room. Where do people end up gathering? Which rooms overheat in the afternoon? Where does the garden feel cut off from the house? A list built from real days is worth more than a folder of pictures, and it gives a designer something solid to work from.

Then the paperwork. Find the survey, the original plans, any past approvals and building reports. It matters more than it sounds. Unapproved work by a previous owner can need a building information certificate from council before new work is approved, and it is far better to find that in January than halfway through a DA.

Then the practicalities. Decide early whether you will stay in the house during the works. On a large renovation, moving out usually shortens the programme and makes the site safer, and that decision changes how a builder sequences the job. Set a budget range that includes consultant fees, approval costs, a contingency and the garden as well as the build.

Then the people. January is quieter for design and build teams than late summer, when everyone who made the same resolution starts calling. It is a good time to meet two or three teams, walk them through the house and see how they think.

Why the garden belongs in the brief now

A renovation tears up the garden whether you plan for it or not. Machinery needs access, spoil has to go somewhere and new drainage has to run somewhere. When the garden is designed later, as a separate job, homeowners often pay to dig the same ground twice and to repair new paving that was damaged getting materials in.

Designing the two together changes that. Levels between the new living area and the terrace can be set once. Stormwater and irrigation go in while the ground is open. If a pool is on the wish list, excavating it while the site already has machinery and access is usually simpler than coming back for it later. It is the main reason we run house and garden as one project at Landart, and it is the part of the brief most worth getting right in the planning stage.

For more on how this works, see our home renovation, home building and landscaping services.

What NSW rules apply before work starts?

  • Contract and insurance. In NSW, residential building work over $20,000 needs a written contract, and the builder must provide a Home Building Compensation Fund certificate before taking a deposit or starting work. The deposit itself is capped at 10 per cent.
  • BASIX. Alterations and additions valued at $50,000 or more need a BASIX certificate, which sets energy and water targets for the work. The standards were raised in October 2023, so a design drawn before then may need revisiting.
  • Licence check. Check your builder’s licence on the NSW Government licence check before signing.
  • Trees. Both Woollahra and Northern Beaches councils protect trees above a certain size. Removing one for a renovation needs approval, and it is best dealt with in the design rather than found on site.
  • Pools. Any new or altered pool must meet NSW pool barrier rules and be registered on the NSW Swimming Pool Register.

Talk to the team about your renovation

If the holidays have you thinking about what your home could be, the best next step is a conversation about the site and the brief. We will look at what the house and garden can become together, which approval path is likely, and what a realistic timeline looks like from where you are now. Start your project with Landart.

Frequently asked questions

How long does a high-end renovation take to get approved in Sydney?

It depends on scale and approval path. As a guide, design and documentation take two to four months depending on scale, a CDC takes about six to eight weeks to document and approve, and a DA several months. We set out a project-specific pre-build programme after the first site visit.

What affects the cost of a high-end renovation in Sydney?

Every project is different, so we price from the brief and the site rather than a rate per square metre. The biggest variables are structural change, the extent of new glazing, site access and whether the garden is part of the scope. A feasibility review early on gives you a realistic budget range before design goes too far.

Do I need a DA or a CDC to renovate?

If the work meets the state’s complying development standards, and the site is not a heritage item or otherwise excluded, a CDC may be possible. Many renovations in the Eastern Suburbs and on the Northern Beaches need a DA because of heritage, bushfire, flood, coastal or design controls. We confirm the path during feasibility.

Can building start in January?

Most of the industry closes from just before Christmas until early or mid January, and councils largely shut down through December and January. A project can start in January only if design, approval and contract were finished before the break, which is why planning over summer usually points towards an autumn start.

Can we live in the house during the renovation?

Sometimes, on smaller or staged projects. For a major renovation, moving out usually shortens the programme, keeps the family safer and gives the builder clear access.

Should the garden be designed at the same time as the renovation?

Yes, where possible. Levels, drainage, access and any pool excavation are far easier to resolve in one design, and it avoids paying to dig or repair the same ground twice.

Further reading

When you’re ready to talk about your home, get in touch with Landart.